“October Project, stage 7”

Sand Blast works for the metal parts in the bridge and painting the metal surfaces to adhere the concrete to the metal by epoxy materials adhering to the humid surfaces."October Project, stage 7"

Project Information

Year:

1989

Country:

Egypt

Have a
project in
mind?