Contract 16/2 El Gabal El Asfar.

Injection and filling the expansion joints to stop infiltration works in Contract 16/2 El Gabal El Asfar.

  • Injection and filling the expansion joints to stop infiltration.
  • Injection and reservoirs’ treatment.
  • Injection between pipes’ joints to stop infiltration.

Project Information

Year:

1998

Country:

Egypt

Have a
project in
mind?