• Supply and execution of injection to stop the underground infiltration through the connection of 16 pipes of 2 m diameter
• Supply and install new water cut Injection system for the major units to produce electricity
• Stop the infiltration from the valves room and electricity room and the (wells)• Stop the infiltration and cure the expansion joints in the major units for producing electricity
• Isolate and inject the expansion joints in all the units of the station
• Covering and repairing the cast iron pipes with Cemtex low viscosity epoxy grout
• Treatment of the cracks in the main pipe of the station of 450mm diameter using lining of the pipe