• Supply and execution of injection to stop the underground infiltration through the connection of 16 pipes of 2 m diameter
• Supply and install new water cut Injection system for the major units to produce electricity• Stop the infiltration from the valves room and electricity room and the (wells)• Stop the infiltration and cure the expansion joints in the major units for producing electricity
• Isolate and inject the expansion joints in all the units of the station
• Covering and repairing the cast iron pipes with Cemtex low viscosity epoxy grout
• Treatment of the cracks in the main pipe of the station of 450mm diameter using lining of the pipe